Poor connectivity costs regional organisations billions

Poor connectivity costs regional organisations billions

Poor indoor mobile coverage could be constraining North West productivity. Freshwave’s research estimates annual regional losses of £12bn, with organisations considering further connectivity investment.


Inadequate indoor mobile coverage could be costing organisations across North West England £12bn annually, according to research examining the commercial and operational consequences of poor connectivity across British businesses and public services.

Connectivity infrastructure provider Freshwave estimates that £8.1bn of the regional impact falls on public sector organisations, with the remaining £3.9bn attributable to private sector activity.

The findings are drawn from its Mobile Connectivity ROI Index 2026, developed with research and consulting company STL Partners. The study involved 900 senior executives and technology decision-makers across nine industries throughout the UK.

Participating organisations employed more than 100 people and had annual revenues or budgets exceeding £50m. The estimated financial losses are based on respondents’ assessments of the consequences of inadequate connectivity and subsequent extrapolation across relevant industries.

Three-quarters of North West organisations surveyed expect their connectivity budgets to increase, while 57% are considering indoor 4G or 5G infrastructure upgrades to support artificial intelligence applications.

The latter proportion was the highest recorded among Britain’s larger regions, reflecting the relationship between connectivity investment and wider digital transformation programmes.

Investment across commercial and public buildings —

Freshwave’s national research estimates that poor indoor mobile coverage could be costing UK organisations £103bn annually. Its respondents believe that improvements to coverage could recover more than £60bn of those losses.

Public sector respondents attributed £63bn of the estimated national losses to their organisations. Freshwave calculates that better coverage could recover approximately £39bn of that amount, based on respondents’ assessments of the potential operational benefits.

The regional findings place particular emphasis on public infrastructure, where mobile connectivity must frequently accommodate employees, contractors, service users, and visitors within the same premises.

Coverage inside buildings can be affected by construction materials, internal layouts, and the distance from external mobile network infrastructure. Addressing those limitations can require investment by property owners and occupiers alongside the mobile operators themselves.

Freshwave has been working with Wigan Council in Greater Manchester to improve connectivity across municipal buildings. Installations at Wigan Town Hall and the two Wigan Life Centre buildings form part of a programme covering indoor and outdoor mobile infrastructure.

Such projects require coordination between technology procurement, estate management, and operational teams, particularly where facilities accommodate several organisations or deliver services directly to the public.

The £12bn regional estimate represents respondents’ perceptions of lost productivity and financial performance rather than independently measured reductions in economic output. Nevertheless, the reported investment intentions indicate that organisations across the North West are incorporating mobile connectivity into their wider technology expenditure plans.

—